Top loading case for ETC fixtures with a lift-over lid, a heavy duty divider and foam lining, on base castors.
Build Highlights
- Heavy Duty Divider
- Base Castors
- Top Loading Packer
- Foam Lined
Project Gallery (1)
Common Questions
Can this design be replicated for my equipment?
Yes. We design every case in-house, so this build can be adapted to your dimensions. Send us your equipment specs or a sample and we'll design one around it.
What's the typical lead time?
Standard builds take 5 to 10 days. Large runs and complex fit-outs can take longer, so tell us your deadline up front and we'll confirm a date before you commit.
Do you ship Australia-wide?
We design and manufacture in Melbourne and ship nationwide. Contact us for freight options to your location.




